CI
DOT #: 2287346

Critical Path Metalworks Inc

Interstate Non Hazmat
(0 reviews) 0 out of 5
23 Mar, 2012 (13 Years, 11 Months)

DOT Number: 2287346

|

Docket Number: Private

DOT Number: 2287346

|

Docket Number: Private

Do you work for Critical Path Metalworks Inc?

Overview

Critical Path Metalworks Inc, doing business as Csm Industrial Constructors, is a trucking company based in Silver Cliff, CO 81252, US. Operating since 23 Mar, 2012, the company has over 13 Years, 11 Months, of experience in the industry. With DOT number 2287346, Critical Path Metalworks Inc specializes in interstate non hazmat cargo transport. The company holds FMCSA inactive authority.
Physical location: 614 Cliff Street, Silver Cliff, CO 81252, US.
Mailing location: Po Box 868, Westcliffe, CO 81252, US.

DUNS

Private

SCAC

Private

Representative

Private

OIC State

Colorado

Fleet Details

TractorsTrailersTrucks
Owned-21
Leased---
Temporary---

Business Information

Target Job Market:Private

Availability:Private

Number of Trucks:1

Number of Drivers:2

Hazardous Materials:No

Passenger Carrier:No

MCS-150 Date:06 Jun, 2016

MCS-150 Mileage 25,000 (2,015)

Shipment types:Private

Use Electronic Tracking:No

Cargo Types / Freight Types / Commodities:

  • Other
  • Motor Vehicles
  • Logs, Poles, Beams, Lumber
  • Building Materials
  • Machinery, Large Objects
  • Construction

Truck Types / Equipment Types:

  • Flatbed Trailer
  • Step Deck
  • RGN Trailer
  • Car Hauler
  • Lowboy Trailer
  • Dry Van
  • Conestoga Trailer
  • Dump Trailer

Operating status:

  • Private(Property)

Available Capacity

Real-time available capacity at Carrier Network is directly shared by Critical Path Metalworks Inc, providing detailed information about their available loads and shipment frequencies. Critical Path Metalworks Inc can forecast their available capacity. Our platform ensures you stay informed with up-to-date availability from Critical Path Metalworks Inc, making your logistics planning seamless and efficient.

No loads are currently available.

Insurance

Access the latest insurance data periodically updated by the FMCSA, ensuring you have the most current information to make informed decisions. Carrier Network does not control this data, maintaining its integrity and reliability for users. Checkout latest Insurance data of Critical Path Metalworks Inc.

Insurance data not available.
Click here to view the insurance history of Critical Path Metalworks Inc.

Lanes & Regions

Explore detailed information on lanes and regions provided and managed by Critical Path Metalworks Inc, backed by multiple reviews and ratings. Carrier Network offers insights into Critical Path Metalworks Inc-managed routes, ensuring you make well-informed, accurate, and reliable logistics decisions based on trusted feedback. This ensures seamless planning for shippers and brokers.

Lanes:
Private

This information was provided by Critical Path Metalworks Inc

Primary Operating Regions
Headquarters
Terminals

Safety

Ensure the utmost safety in your logistics operations with up-to-date safety data periodically updated by the FMCSA. Carrier Network provides you with reliable information, helping you make well-informed decisions based on the latest safety standards. Checkout Violations, Accident, and Inspections report of Critical Path Metalworks Inc

Authorizations

FMCSA authority status: 
None

Carrier operation:  Interstate Non Hazmat

Cargo authorization:  Property

Click here to view the authority history of Critical Path Metalworks Inc.

Safety Violations

TotalSevereOut of ServiceMeasurePercentile
Vehicle Maintenance 0 0 0 0 0
Unsafe Driving 0 0 0 0 0
Hours of Service Compliance 0 0 0 0 0
Driver Fitness 0 0 0 0 0
Controlled Substances 0 0 0 0 0

Accident Report

Last 6 Months6-12 Months ago12-24 Months agoTotal
Crashes 0 0 0 0
Fatalities 0 0 0 0
Injuries 0 0 0 0
Tow-away 0 0 0 0

Inspections

InspectionsOOS InspectionsOOS PercentageNational Average
Driver 0 0 0 0
Fatalities 0 0 0 0

Reviews

Discover valuable insights through verified reviews our users provide, which are regularly updated to reflect the latest feedback. Carrier Network ensures you receive authentic user feedback to make well-informed logistics decisions.

Total Reviews

0

Average Ratings

0.0

Timeliness 0/10

Cleanliness 0/10

Communication 0/10

There are no reviews here. Be the first to give a review.